Process 1: Series A Materials Update
Process 1: Series A Materials Update
Part of: Feature Development Protocol
Overview
Trigger: Feature design complete (before implementation) Owner: Product Manager + Marketing Timeline: Within 2 days of feature completion
Required Updates
1. Update docs/series-a/ONE_PAGER.md
- Add feature to “Key Features” section
- Update metrics (performance, cost savings, etc.)
- Revise competitive advantages
2. Update docs/series-a/ELEVATOR_PITCH.md
- Incorporate feature into 30/60-second pitches
- Update problem/solution narrative if applicable
3. Update docs/series-a/SERIES_A_PITCH_DECK.md
- Add feature to relevant slides (product, roadmap, moat)
- Update metrics slides with new benchmarks
- Refresh competitive analysis
4. Update docs/series-a/DATABASE_VALUATION.md
- Recalculate valuation with new feature impact
- Update revenue projections if feature is tier 1
Completion Checklist
- ONE_PAGER.md updated with feature
- ELEVATOR_PITCH.md revised with feature impact
- SERIES_A_PITCH_DECK.md slides updated
- DATABASE_VALUATION.md metrics refreshed
- All changes reviewed by Product + Marketing
Navigation: ← Back to Protocol Index | Next: Process 2 →