Skip to content

Process 1: Series A Materials Update

Process 1: Series A Materials Update

Part of: Feature Development Protocol


Overview

Trigger: Feature design complete (before implementation) Owner: Product Manager + Marketing Timeline: Within 2 days of feature completion


Required Updates

1. Update docs/series-a/ONE_PAGER.md

  • Add feature to “Key Features” section
  • Update metrics (performance, cost savings, etc.)
  • Revise competitive advantages

2. Update docs/series-a/ELEVATOR_PITCH.md

  • Incorporate feature into 30/60-second pitches
  • Update problem/solution narrative if applicable

3. Update docs/series-a/SERIES_A_PITCH_DECK.md

  • Add feature to relevant slides (product, roadmap, moat)
  • Update metrics slides with new benchmarks
  • Refresh competitive analysis

4. Update docs/series-a/DATABASE_VALUATION.md

  • Recalculate valuation with new feature impact
  • Update revenue projections if feature is tier 1

Completion Checklist

  • ONE_PAGER.md updated with feature
  • ELEVATOR_PITCH.md revised with feature impact
  • SERIES_A_PITCH_DECK.md slides updated
  • DATABASE_VALUATION.md metrics refreshed
  • All changes reviewed by Product + Marketing

Navigation: ← Back to Protocol Index | Next: Process 2 →